AwardedIRLWorks
Rosslare Coastal Erosion and Flood Relief Scheme - Site investigations Burrow Road.
- Published
- Published 27 January 2025
- Deadline
- Closed 28 February 2024
Overview
The investigations are required to inform the design of the tidal flood relief works along approximately 2km of Burrow Road, Rosslare. The investigation works will involve but not limited to the drilling of cable percussion and rotary core boreholes, inspection pits, associated temporary traffic management, in-situ testing, laboratory testing and production of a factual ground investigation. The site investigations will consist of: - Boreholes to a depth of 10m, at every 100m - Rock coring would be required if hit rock within first 10km; to a depth of 10m. Rock sampling required. - SPT's will be required in boreholes at every meter. - Heavy Dynamic Probing (DPH) at 25m centres. - Trial pits to a depth of 3m, at every 100m. - Sampling would be required at every m within the boreholes and trial holes to take standard classification testing, chemical testing, shear testing. It is intended that the site investigation would take place along or just off the seaward edge of the road, and/or in the existing embankment.
Key details
- Country
- IRL
- Status
- Awarded
- Category
- Works
- Procedure
- Open
- Published
- 27 January 2025
- Questions by
- 21 February 2024
- Deadline
- Closed
Ground investigation workSite-investigation services
Award outcome
- Awarded value
- €99,433
- Award date
- 27 January 2025
- Causeway Geotech Ltd
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract Award Notice
27 January 2025
Contracting authority
Wexford County Council
Procuring entityWexford, IRL
IE-EPPS-CA: 2182
Authority website ↗
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.