Skip to content
AwardedIRLWorks

Portarlington Flood Relief Scheme - Site Investigation works

Published
Published 4 March 2025
Deadline
Closed 20 February 2024

Overview

The purpose of this investigation is • to provide geotechnical information on the prevailing ground conditions underlying the site, • to determine the composition of any existing embankments, • to investigate possible sources of any embankment fill material, • to determine groundwater levels • to install instrumentation necessary to capture the long-term behaviour and seasonal variations to the groundwater at key areas across the site and also • to determine the engineering properties of the soils encountered in order to assist in progressing the design. The works will also investigate the presence and details of existing foundations. The site investigation shall comprise the following investigation methods: • 20No. cable percussive boring to a maximum depth of 10m, • construction of groundwater monitoring installations, • 12No. windowless samples with adjacent super heavy dynamic proving to a maximum depth of 5m, • 39No. machine (or hand) excavated trial pits to a maximum depth of 3.0m, • 12No. Observation pits (machine and hand excavated) to investigate existing foundation conditions to a maximum depth of 1.5m, • In situ variable head permeability testing within boreholes and infiltration testing within selected trial pits, • In-situ SPT and hand vane testing, • Installation and retrieval of 5No. groundwater dataloggers, • Geotechnical and geoenvironmental sampling of soil and groundwater, • Geotechnical and geo-environmental laboratory testing, • Groundwater monitoring and • Preparation of a Factual and Interpretive Report, incl. monitoring

Key details

Country
IRL
Status
Awarded
Category
Works
Procedure
Open
Published
4 March 2025
Questions by
31 January 2024
Deadline
Closed
Classification (CPV)
Construction workTest drilling and boring workGeotechnical engineering services

Award outcome

Awarded value
€122,916
Award date
4 March 2025
Winner
  • Ground Investigations Ireland Ltd

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    4 March 2025

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Portarlington Flood Relief Scheme - Site Investigation works — won by Ground Investigations Ireland Ltd — Skim