PE3 Blue Light Innovation
- Published
- Published 4 February 2026
Overview
This requirement is for the delivery of a production-ready digital planning tool that enables emergency services (Police, Fire and Rescue, and Ambulance Trusts) to effectively plan and deliver the decarbonisation of their vehicle fleets and operational estates.
The solution must support strategic electrification planning, improve visibility of electricity network headroom, and reduce the likelihood of unnecessary or premature network reinforcement, while embedding the operational resilience requirements unique to blue light organisations.
The requirement builds directly on the outputs of the completed Phase 1 innovation activity, which validated user need, defined functional and non-functional requirements, and produced tested wireframes and user journeys with engagement from over 60 emergency service organisations. The scope of this commission is therefore delivery focused, translating those agreed designs into an operational system rather than rerunning discovery or design activity.
Core Functional Requirements:
The supplier is required to deliver a minimum viable product (MVP) that provides an endto-end planning journey for a defined set of emergency service sites, including:
- A guided workflow enabling users to model fleet electrification, estate electrification, and associated load impacts.
- Visibility of site-level electrical capacity and network headroom, including constraint indicators and reinforcement triggers.
- Scenario modelling to assess different decarbonisation pathways, including:
- ICE-to-EV fleet replacement logic, charger sizing and charging profiles.
- Specialist vehicle considerations.
- Heat pump, solar PV, battery storage and smart charging options.
- Indicative costs, timescales, and lead-time estimates to support funding, business case development, and connection decisions.
- Portfolio-level aggregation to support roadmap development and prioritisation (post-MVP expansion).
Technical and Delivery Requirements :
The solution must:
-Be delivered as a logically separate, multi-tenanted application built on the existing UKPN ChargePoint Navigator platform and infrastructure, enabling interaction with UKPN systems such as Smart Gateway, NetMap, Autoquote and connection application services.
- Configure and extend existing backend services, data models and APIs to operationalise the agreed wireframes.
- Integrate multiple datasets, including estate data, fleet data, and network capacity information, with appropriate validation, error handling and feedback mechanisms.
- Comply with UK Power Networks' cybersecurity, information governance, and Azure hosting requirements, including agreed authentication and SSO arrangements.
- Be designed from the outset for replication, scale, and transition to business-as-usual (BAU)
The MVP must be production-ready by March 2026 to meet project and customer timelines and to generate evidence for wider rollout decisions.
Key details
- Country
- United Kingdom
- Status
- In delivery
- Procedure
- Direct
- Published
- 4 February 2026
Award outcome
- Awarded value
- £450,000
- Award date
- 12 February 2026
- Contract period
- 24 February 2026 → 23 July 2026
- DOTTED EYES SOLUTIONS LIMITED
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract
12 February 2026
View notice ↗Contract
4 February 2026
View notice ↗
Contracting authority
UK POWER NETWORKS (OPERATIONS) LIMITED
BuyerLondon, United Kingdom
GB-COH: 03870728
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.