Milford Hospital Boiler Room and Heating Distribution Replacement Works

Published
Published 7 January 2026

Overview

The hospital's heating infrastructure comprises two plant rooms: the north room with two 75kW gas boilers serving the X-ray block, and the south room with two 175kW boilers supporting both radiators and air handling units (AHUs). LEDA’s thermal modelling determined a total heating load of around 354kW, prompting a proposed upgrade to 450kW using three 150kW Hamworthy modular boilers. This upgrade will also include new heating and LTHW pumps, a pressurisation unit, expansion vessel, dosing ports, shunt pumps, and a gas safety system, while retaining the existing gas-fired calorifier. The current below-ground pipework serving radiators in both blocks will be replaced by a new system routed through loft areas, with local drops to individual radiators. These radiators will be LST type, each fitted with Danfoss dynamic valves and remote temperature sensors for independent control, eliminating the need for zone valves. Bypass valves will be installed at end-line pipes to ensure minimum flow, and radiant panels will be added to ward areas with grid ceilings and corridors. Pipework drops will be enclosed using Pendock boxing, as detailed in the mechanical services drawings.

Key details

Country
United Kingdom
Status
Contract signed
Procedure
Limited
Published
7 January 2026

Award outcome

Awarded value
£733,657
Award date
5 January 2026
Winner
  • MJG Mechanical Services Ltd

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    7 January 2026

    View notice ↗

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Milford Hospital Boiler Room and Heating Distribution Replacement Works — won by MJG Mechanical Services Ltd — Skim