Contract signedUnited Kingdom
Home › Projects › View projects › Town Hall removal of M & E from 2nd floor Town Hall removal of M & E from 2nd floor
- Published
- Published 31 July 2025
Overview
Following the identification of High risk RAAC within the Mansard extension (the 2nd floor) of the Town Hall, as classified under the IstructE (Institution of Structural Engineers) guidance, the second floor was isolated from use. To further support an evaluation of risk a series of internal investigations have then been undertaken to identify the implications of a single and multiple RAAC collapse. The findings of the investigation confirm that the current floor construction (the roof of the original 1930's building) was never designed to accommodate dynamic loads resulting from a panel failure of this magnitude. The RAAC panels in question span significant distances and are of considerable mass; should one or more panels fail without warning, which is the nature of RAAC, the resulting impact load could therefore exceed the second floor's load-bearing limits causing the floor structure to fail. This could lead to a cascading effect to the floors below. These findings necessitate risk mitigation measures to prevent any potential structural failures and ensure the safety of the building occupants below this area.
Key details
- Country
- United Kingdom
- Status
- Contract signed
- Published
- 31 July 2025
Award outcome
- Awarded value
- £900,000
- Award date
- 27 May 2025
- JEAKINS WEIR LIMITED
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract
31 July 2025
View notice ↗
Contracting authority
Peterborough City Council
BuyerPeterborough, United Kingdom
GB-PPON: PLXM-3229-WVQH
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.