ISO 11 Incinerator Life Extension: WP2 Control Panel Control HAZOP items to reduce operational risk to
- Published
- Published 17 June 2025
Overview
The ISO 11 Incinerator was installed within the "Postmortem - Incinerator" (PMINCIN) building circa 1994/95 and much of the original plant remaining has now reached the end of its lifecycle. Following a period of unreliability throughout 2021, and the outcome of a Hazard and Operability (HAZOP) study during April 2022, the ISO 11 10-year life extension project was initiated, which has been approximately 50% delivered to date.
Work Package 2: Control Panel replacement is currently in the design phase and a detailed design has been produced and the required Control HAZOP (CHAZOP study) completed for the proposed design.
Key details
- Country
- United Kingdom
- Status
- Contract signed
- Procedure
- Direct
- Published
- 17 June 2025
Award outcome
- Award date
- 14 May 2025
- Lührfilter GB Ltd
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract
17 June 2025
View notice ↗
Contracting authority
THE PIRBRIGHT INSTITUTE
BuyerWoking, United Kingdom
GB-COH: 00559784
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.