In deliveryUnited KingdomWorks
Brook Theatre - Refurbishment and alteration works
- Published
- Published 5 July 2024
- Deadline
- Closed 23 August 2024
Overview
The Brook Theatre is a well-used community resource as well as an important local venue for professional touring productions, but as a result the building is looking tired and quite dated in its internal presentation, so a key element of this project is to improve the general presentation of the interior.
There are many limitations presented by the building which restrict the way that the building can be used but also impact on the overall visitor experience. This is primarily in connection with the front of house spaces including limited gathering spaces in the café and bar, toilets, and accessibility.
Key aims for the project include:
• Increase the available front of house space
• Front of house spaces to be more open and fluid
• Create a café with street frontage which would be a destination in itself as well as a co-working space
• Provide opportunities / space to be able to support emerging / developmental companies
• Deal with some of the acoustic limitations of the building which are mainly generated by the audience, especially front of house
• Introduce a digital overlay – infrastructure to use digital backdrops, projection etc in productions
• Consider the impact of the chandeliers in the Main Theatre and if they could be removed since they restrict performances including projection and lighting
• Consider how to introduce more flexible stage lighting infrastructure (such as a grid) within the context of the historic interior
• Provide storage for the auditorium (which could be in the basement if a lift can be extended there)
• Consider improving the access to the stage for performers who are wheelchair users
• Providing air conditioning to the main theatre auditorium
• Reconfiguring the fire exit from the 2nd floor dressing rooms
• Reviewing the fire compartmentation between back stage and auditorium
• Reviewing the use of the storage areas in the basement and the impact on the fire strategy
• Complete refurbishment of all dance and drama studios on the ground and basement floors
Key details
- Country
- United Kingdom
- Status
- In delivery
- Category
- Works
- Procedure
- Open
- Published
- 5 July 2024
- Deadline
- Closed
Construction work
Award outcome
- Awarded value
- £10,801,760
- Award date
- 3 February 2025
- Contract period
- — → 2 October 2026
- Thomas Sinden Ltd
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract
4 February 2025
View notice ↗Contract Notice
5 July 2024
View notice ↗
Contracting authority
Medway Council
BuyerChatham, United Kingdom
Authority website ↗
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.