AwardedUnited KingdomWorks£75,000
CWF Lot 2A - Reconstruction of Scrithwaite Wood Retaining Wall
- Published
- Published 31 March 2025
- Deadline
- Closed 6 March 2025
Overview
his project is for the design and reconstruction of approximately 15m length of Scrithwaite Wood Retaining Wall on the C5008, North of Broughton Mills.
The existing wall has partially collapsed, with an adjacent length being in an unstable condition. The wall retains approximately 2.1m (max) of land (public highway) above a steep inclined slope. The collapsed section of the wall has created a residual slope of consolidated material with a 1m vertical slope of exposed natural gravel material below the defined road construction.
The Contractor will be required to undertake the role of Principal Designer & Principal Contractor and fulfil their obligations in accordance with CDM 2015.
The Contractor will be required to design and construct the permanent engineered highway retaining wall.
The Contractor will be required to design and check temporary works as required e.g. provision of shoring for excavation.
The Contractor should consider the design period required for the temporary and permanent works, including Technical Approval to CG300 and Design & Check Certification - considered to be a Category 0 structure.
Key details
- Country
- United Kingdom
- Status
- Awarded
- Category
- Works
- Estimated value
- £75,000
- SME suitable
- No
- Published
- 31 March 2025
- Deadline
- Closed
Construction work
Award outcome
- Awarded value
- £116,868
- Award date
- 30 March 2025
- Contract period
- 27 April 2025 → 23 May 2025
- Metcalfe Plant Hire Ltd
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract Award Notice
31 March 2025
Contracting authority
Westmorland and Furness Council
BuyerKendal, United Kingdom
Authority website ↗
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.