Provision for Phased strip up and replacement of 36,000m2 of resin bonded Gold Top tarmac to Lee Valley owned areas on Queen Elizabeth Olympic Park - AWARD

Published
Published 18 March 2025
Deadline
Closed 4 February 2025

Overview

The Queen Elizabeth Olympic Park was home to the 2012 London Olympic Games. The Lee Valley Regional Park Authority is now the proud owner of two of the venues based on the park: The Lee Valley VeloPark and The Lee Valley Hockey & Tennis Centre. LVRPA owns an area of land that currently has around 36,000m2 of resin bonded 'Gold Top' surfacing. Much of the resin bonded surface is now showing signs of deterioration and requires stripping up and replacing. The substrate is mainly concrete laid to falls and the areas generally drain into Acco drainage channels. There are some additional areas of resin bound surfaces, but these are fairly small in terms of square metreage. The resin bound areas are porous and generally drain through holes drilled through the substrate into the ground below. This project is for the phased replacement of the Gold Top areas on a priority basis. It is envisaged that the Authority will split the 36,000m2 into approx. 4500m2/annum over an 8 phase period (one phase per financial year). The contractor will be required to remeasure areas on completion and works will be paid on a square metre basis. The first phase of works will be scheduled to take place in March/April 2025 due to financial reasons but generally it is envisaged that the following phases will be carried out in May/June each year with the second phase being a 'follow on' to phase 1 in 2025. The contractor should price for each phase separately and in doing so allow a nominal uplift for inflation and material price increases.

Key details

Country
United Kingdom
Status
Awarded
Category
Works
Procedure
Open
SME suitable
Yes
Published
18 March 2025
Deadline
Closed
Classification (CPV)
Surface work for footpaths

Award outcome

Awarded value
£0
Award date
18 March 2025
Contract period
23 March 2025 → 30 June 2031
Winner
  • Henderson & Taylor (Public Works) Limited

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    18 March 2025

Contracting authority

  • Lee Valley Regional Park Authority

    Buyer

    Middlesex, United Kingdom

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Provision for Phased strip up and replacement of 36,000m2 of resin bonded Gold Top tarmac to Lee Valley owned areas on Queen Elizabeth Olympic Park - AWARD — won by Henderson & Taylor (Public Works) Limited — Skim