AwardedUnited KingdomWorks£181,335
Task Order from PDF framework for (619572) M60 River Irk Waterproofing Scheme
- Published
- Published 24 September 2025
- Deadline
- Closed 15 April 2025
Overview
The M60 River Irk Bridge is a single-span, simply supported underbridge that carries the dual three-lane M60
Motorway and junction 19 slip roads over the River Irk and a riverside footpath. The deck consists of rolled steel
beams, acting compositely with in-situ reinforced concrete slab. The deck is split into two halves, separated by a
longitudinal joint in the central reserve. It is fixed at the west abutment and free at the east abutment.
The structure was commissioned in 1996 and has a design capacity of HA + 45HB.
During a previous resurfacing scheme over the bridge, the road planer damaged the deck waterproofing.
According to the Aone+ waterproofing inspection report of 2010, the damage is in lane 3 in the anticlockwise
direction, near the elastomeric joint on the east side of the bridge. The report also mentions that Volker Laser
repaired the small, damaged areas however, the quality of repair is not sufficient as a long-term solution. There
is no assurance of 150mm overlap between the existing waterproofing and waterproofing patch repair. Therefore,
a long-term waterproofing solution is required on anticlockwise carriageway from stringcourse to stringcourse.
Construction ECI was undertaken FY24/25 which included site surveys and agreement of works methodology
and programme. The detailed design of the scheme has been completed by WSP
Key details
- Country
- United Kingdom
- Status
- Awarded
- Category
- Works
- Estimated value
- £181,335
- Procedure
- Selective
- SME suitable
- Yes
- Published
- 24 September 2025
- Deadline
- Closed
Surface work for highways
Award outcome
- Awarded value
- £181,335
- Award date
- 14 April 2025
- Contract period
- 12 June 2025 → 6 February 2026
- BREEDON COLAS LIMITED
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract Award Notice
24 September 2025
Contracting authority
National Highways
BuyerBirmingham, United Kingdom
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.