Skip to content
AwardedUnited KingdomWorks£271,519

CWF 2a C2016 Stage 2 Construction - Camerton sheet piling with capping beam, rock revetment and carriageway renewal design and build works

Published
Published 9 November 2023
Deadline
Closed 4 August 2023

Overview

Stage 2 Construction Contract - The scheme comprises remedial works for a section of highway, on the C2016 between Camerton and Great Broughton. The site is located approximately 1km east of Camerton, Cumbria, at National Grid Reference - NY 04431 30768. The site comprises an area of failed highway embankment carrying the C2016 adjacent to the River Derwent. The slope failure comprises a translational slip around 40m long, 1.5m wide (max) and 2m high, where material supporting the C2016 has moved downslope into the channel of the River Derwent and subsequently washed downstream. The anticipated remediation works comprise the design and build construction of a sheet pile retaining wall with concrete capping beam, the embankment reconstructed with engineered fill with carriageway reinstated to the correct standards and the installation of rock armour revetment to provide additional erosion resistance.

Key details

Country
United Kingdom
Status
Awarded
Category
Works
Estimated value
£271,519
SME suitable
Yes
Published
9 November 2023
Deadline
Closed
Classification (CPV)
Construction work

Award outcome

Awarded value
£307,237
Award date
30 March 2025
Contract period
30 April 2025 → 30 September 2025
Winner
  • A E Yates

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    15 April 2025

  2. Contract Award Notice

    9 November 2023

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: CWF 2a C2016 Stage 2 Construction - Camerton sheet piling with capping beam, rock revetment and carriageway renewal design and build works — won by A E Yates — Skim